Home
Join us
Donate
Help
Log in
Home
About us
Join us
Events
Forum
Contact
Reply to: T-Trak Upgrades Identified January, 2021
*
Mandatory
fields
Author
*
Body
<blockquote><strong class="quote">Charles Peterson wrote:</strong> <P>Bruce Alcock and I reviewed each of our T-Trak modules on display at the Fred Jones Art Museum (Norman) and identified upgrades we could do to each module to improve both looks and performance. Each module had up to a handful of upgrades, but we plan to check electrical continuity, telegraph line setback (from tracks), and backboard art on most all of the modules. Anyone wishing to join in affecting these upgrades is welcome to join in and should contact Bruce Alcock. These modules can be taken home to be worked on if preferable, otherwise, they can be done during work sessions at Tuttle Top Farm (Bruce's estate).</P> </blockquote><br>
You can use basic HTML tags.
Body should be less than 50 kilobytes
Maintained by
webmaster@oknrail.org
Material Copyright © 2024 Oklahoma N-Rail, Inc.
Powered by
Wild Apricot
Membership Software